Upper Walnut Creek Sanitary Sewer Improvements

The Upper Walnut Creek Sanitary Sewer Improvement project involved the replacement, realignment, and upsizing of an existing 42-inch RCP gravity sewer system to a 60-inch fiberglass reinforced pipe (FRP) system. The scope of work included the installation of 9,203 linear feet of 60-inch FRP, 9,136 linear feet of 60-inch reinforced concrete pipe liner with FRP, 60 polymer concrete manholes, and 11,579 linear feet of 8-inch and 12-inch gravity sewer with 91 manholes. Additionally, 5,943 linear feet of 6-inch and 8-inch waterline were also installed.

The project featured several specialized components, such as multiple 8’x8’ junction boxes with slide gates, 287 linear feet of 60-inch micro-tunneling, bypassing of the existing 42-inch RCP and 48-inch gravity sewer, and the abandonment of 18,000 linear feet of the old 42-inch gravity sewer. Park Construction successfully completed the project ahead of schedule and under budget, demonstrating exceptional efficiency and project management.

Ridge Runner PCS
Ridge Runner PCS
Ridge Runner PCS

Project Details

  • Client: Raleigh Water
  • Location: Raleigh, NC
  • Cost: $40,005,615